The drawing is used to record as built conditions of fiber pull boxes including the material attributes duct placement cable sequential measurement etc.
Fiber optic pull box detail.
Ensure that the pull or splice box cover is flush with the concrete apron or sidewalk.
Shop drawings shall be submitted which detail the pull box frame lid and hangers when.
Install pull and splice boxes in accordance with the miami dade pull box fiber optic box details n t s index.
A new fiber optic installation standard when installing optical cable what you don t know could really hurt you or damage your cable.
Familiarizing yourselfwith standard 301 is a smart step to avoid such problems up until a little over a year ago an installation standard for optical cable didn t exist.
The pull box shall include a grounding rod and fiber optic cable hangers as shown in the plans.
Back to products previous next.
Direction of fiber optic cable run or its manhole location number of fibers in cable footage measurement at pull box fiber manufacturer type of cable fiber cable label grounding detail to be attached to each fiber optic cable located in all pull box and its manholes device attached its pull box installation weather tight with lock backbone and.